Square bed spacing is the selected compact planting method. Container spacing describes root positions; foliage may spread beyond the pot. Seed quantities include 10% spare, with 2 small seeds per target and one bean seed per target. Follow cultivar packets if their spacing or sowing instructions differ.
Planting windows
Soil and weather decide the actual planting day.
2027-05-15 to 2027-05-29
Compact sweet pepper · pot-1
Plant purchased seedlings. Use a compact sweet cultivar and sturdy seedlings; wait for nights above 50°F (10°C).
Complete first: pot-1-harden.
2027-05-08 to 2027-05-28
Compact sweet pepper · pot-1
Acclimate seedlings. Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun.
Complete first: pot-1-1-seedling.
From planting to clearing
Season length not yet checked. Add your first fall frost to check maturity.
These are planning windows. Record what actually happens in your season journal; clear the space before starting the next crop.
pot-1 · Compact sweet pepperPhase 1 · batch 1
Seedlings2027-05-01 to 2027-05-21
Check 1 healthy Compact sweet pepper seedlings for this batch. Deduct plants already owned before buying. Acclimate seedlings gradually; plant at their nursery depth and water the root ball.
Harden off2027-05-08 to 2027-05-28
Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun. Ask how nursery plants have been acclimated; allow about a week unless local guidance says otherwise.
Transplant2027-05-15 to 2027-05-29
Use a compact sweet cultivar and sturdy seedlings; wait for nights above 50°F (10°C). Plant only when the seed packet and local weather conditions agree.
Tend2027-05-22 to 2027-08-21
Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
Harvest check2027-07-14 to 2027-10-03
Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
Clear / review2027-10-10 to 2027-10-10
Remove spent plants and check the soil before a successor starts. 42 harvest days and 7 clearing days are planning allowances; actual crop condition decides the changeover. Record actual harvests or losses. Keep healthy perennial clumps if you are not reusing their space; revise the next planting accordingly.
What to buy
Owned items are deducted before buying.
Net supply list
Supply
Required
Already owned
Buy
Container potting mix
40 L
0 L
1 × 40 L bags
Position labels (reuse after a crop clears)
1 each
0 each
1 each
Measuring tool
1 each
0 each
1 each
Gentle watering tool
1 each
0 each
1 each
Compact sweet pepper · pot-1
1 seedlings
0 seedlings
1 seedlings
Compact pepper stake · pot-1
1 each
0 each
1 each
Mix: 40 L theoretical × 1 allowance = 40 L; minus 0 L owned = 40 L net. Buying 40 L leaves 0 L beyond the net requirement. Allowance is your choice; no fixed compaction loss is assumed.
Your full season
28 weeks, through harvest checks and bed clearing. Check off each week as you work.
01Prepare and begin2027-04-01 — 2027-04-07To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
Measure the usable space. Prepare 40.0 L of potting mix before allowance. Use one compact sweet pepper per pot. A late indoor start needs a nursery plant or a later season, not a backdated sowing.
02Check, tend and act · week 22027-04-08 — 2027-04-14To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
Check the next dated stage, keep unused soil protected and record any actual harvest or crop loss before changing the plan.
03Check, tend and act · week 32027-04-15 — 2027-04-21To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
Check the next dated stage, keep unused soil protected and record any actual harvest or crop loss before changing the plan.
04Check, tend and act · week 42027-04-22 — 2027-04-28To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
05Check, tend and act · week 52027-04-29 — 2027-05-05To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check seedling stock. Check 1 healthy Compact sweet pepper seedlings for this batch. Deduct plants already owned before buying. Acclimate seedlings gradually; plant at their nursery depth and water the root ball.
06Check, tend and act · week 62027-05-06 — 2027-05-12To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check seedling stock. Check 1 healthy Compact sweet pepper seedlings for this batch. Deduct plants already owned before buying. Acclimate seedlings gradually; plant at their nursery depth and water the root ball.
pot-1 (Compact sweet pepper), batch 1: Acclimate seedlings. Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun. Ask how nursery plants have been acclimated; allow about a week unless local guidance says otherwise.
07Check, tend and act · week 72027-05-13 — 2027-05-19To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check seedling stock. Check 1 healthy Compact sweet pepper seedlings for this batch. Deduct plants already owned before buying. Acclimate seedlings gradually; plant at their nursery depth and water the root ball.
pot-1 (Compact sweet pepper), batch 1: Acclimate seedlings. Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun. Ask how nursery plants have been acclimated; allow about a week unless local guidance says otherwise.
pot-1 (Compact sweet pepper), batch 1: Plant purchased seedlings. Use a compact sweet cultivar and sturdy seedlings; wait for nights above 50°F (10°C). Plant only when the seed packet and local weather conditions agree.
08Check, tend and act · week 82027-05-20 — 2027-05-26To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check seedling stock. Check 1 healthy Compact sweet pepper seedlings for this batch. Deduct plants already owned before buying. Acclimate seedlings gradually; plant at their nursery depth and water the root ball.
pot-1 (Compact sweet pepper), batch 1: Acclimate seedlings. Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun. Ask how nursery plants have been acclimated; allow about a week unless local guidance says otherwise.
pot-1 (Compact sweet pepper), batch 1: Plant purchased seedlings. Use a compact sweet cultivar and sturdy seedlings; wait for nights above 50°F (10°C). Plant only when the seed packet and local weather conditions agree.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
09Check, tend and act · week 92027-05-27 — 2027-06-02To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Acclimate seedlings. Increase outdoor exposure gradually; protect from frost, strong wind and harsh sun. Ask how nursery plants have been acclimated; allow about a week unless local guidance says otherwise.
pot-1 (Compact sweet pepper), batch 1: Plant purchased seedlings. Use a compact sweet cultivar and sturdy seedlings; wait for nights above 50°F (10°C). Plant only when the seed packet and local weather conditions agree.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
10Check, tend and act · week 102027-06-03 — 2027-06-09To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
11Check, tend and act · week 112027-06-10 — 2027-06-16To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
12Check, tend and act · week 122027-06-17 — 2027-06-23To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
13Check, tend and act · week 132027-06-24 — 2027-06-30To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
14Check, tend and act · week 142027-07-01 — 2027-07-07To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
15Check, tend and act · week 152027-07-08 — 2027-07-14To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
16Check, tend and act · week 162027-07-15 — 2027-07-21To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
17Check, tend and act · week 172027-07-22 — 2027-07-28To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
18Check, tend and act · week 182027-07-29 — 2027-08-04To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
19Check, tend and act · week 192027-08-05 — 2027-08-11To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
20Check, tend and act · week 202027-08-12 — 2027-08-18To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
21Check, tend and act · week 212027-08-19 — 2027-08-25To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Tend the growing crop. Check soil moisture and support ties as fruits enlarge; consult the cultivar color-at-ripeness label. Check moisture, surviving plants, weeds, support and visible crop stage; adjust to rain, heat and drainage.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
22Check, tend and act · week 222027-08-26 — 2027-09-01To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
23Check, tend and act · week 232027-09-02 — 2027-09-08To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
24Check, tend and act · week 242027-09-09 — 2027-09-15To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
25Check, tend and act · week 252027-09-16 — 2027-09-22To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
26Check, tend and act · week 262027-09-23 — 2027-09-29To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
27Check, tend and act · week 272027-09-30 — 2027-10-06To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Check harvest readiness. Clip usable fruit with clean snips rather than pulling; colored ripe fruit can take longer than green fruit. The 60–85-day range begins at outdoor transplanting; check the cultivar and actual crop. Record what is actually ready; this estimate is not a yield guarantee.
28Finish and review the season2027-10-07 — 2027-10-13To do
Check moisture by touch in each active root zone; adjust watering to rain, heat and drainage. Containers may need checks between weekly visits.
pot-1 (Compact sweet pepper), batch 1: Clear and review the planting. Remove spent plants and check the soil before a successor starts. 42 harvest days and 7 clearing days are planning allowances; actual crop condition decides the changeover. Record actual harvests or losses. Keep healthy perennial clumps if you are not reusing their space; revise the next planting accordingly.
Recount surviving plants before buying replacements. Check remaining seed, seedling and growing-mix inventory.
Review harvest and crop-loss records, clear or retain plants as appropriate, and update remaining stock before planning the next season.
Assumptions and sources
Spacing is for the selected compact planting method; follow your cultivar packet where it differs.
Seed allowance and minimum root-space limits are planning choices, not germination or yield guarantees.
Dates are preparation windows, not forecasts. Confirm soil temperature, weather and actual crop stage.
First fall frost is a conservative planning boundary, including for hardy crops. Continuing beyond it needs suitable local guidance and protection.
Harvest and clearing durations are planning allowances. A successor waits for the final preceding batch to clear; actual crop progress may move those dates.
Fall plans use a 14-day buffer beyond estimated maturity. Successors wait for the final preceding batch, including its harvest allowance and clearing period. The lifecycle shows those crop-specific windows; the zone must actually be empty. Minimum sun and root-space thresholds are planning limits, with cultivar and climate variation.
UMN Extension: Growing peppersStart pepper seed about eight weeks before outdoor planting, or buy sturdy seedlings. Transplant after nights exceed 50°F. Select compact sweet cultivars and check their maturity label. Accessed 2026-10-13.
UMN Extension: Planting the vegetable gardenCool and warm season establishment; weather and soil readiness matter. Minnesota month dates are not used as global dates. Accessed 2026-10-13.
UMN Extension: Planting for fall harvestMaturity is a cultivar-dependent estimate; our extra 14-day fall buffer is an explicit planning assumption. Accessed 2026-10-13.
Plan garden-45 · version 2 · calculation 2. Actual germination, harvest and local climate performance have not been field tested.
Saved plans & local activity
This activity file stays on this device and excludes your dates, dimensions and inventory. Anonymous site statistics are described in our privacy page.
More plans for this space
Pot 1 · phase 1. Each dot is one target position. 20 L usable · diameter 35.7 cmPot 2 · phase 1. Each dot is one target position. 20 L usable · diameter 35.7 cmPot 3 · phase 1. Each dot is one target position. 20 L usable · diameter 35.7 cm
Pot 1 · phase 1. Each dot is one target position. 25 L usable · diameter 39.9 cmPot 2 · phase 1. Each dot is one target position. 25 L usable · diameter 39.9 cmPot 3 · phase 1. Each dot is one target position. 25 L usable · diameter 39.9 cmPot 4 · phase 1. Each dot is one target position. 25 L usable · diameter 39.9 cm